Skip to content

Statuses, priority and trackers

Every task carries a status, a priority and a tracker. The board groups tasks by status, which is why the two views stay in sync.

Status Meaning
New Captured, not started.
In Progress Being worked.
In review Handed back and awaiting verification.
Blocked Cannot proceed yet.
Resolved Done, awaiting closure.
Closed Finished.

Low, Normal, High, Urgent. Priority drives ordering and the By priority report.

The tracker classifies the kind of work (for example bug, feature or support) and is used for grouping and reports.

  • Tags — free labels (for example billing, ux, frontend); filter with the Tag picker.
  • Assignee, start date, due date, reminder, progress and estimated hours.
  • Subtasks — shown with a subtask marker inside the parent.
  • Scope — All, Assigned, Created, Watching.
  • Due — Any, Today, Tomorrow, This week (overdue dates show in red).

The VNCtask board grouped by status, with priorities and tags on the cards

Applies to VNClagoon 2026.09 and later. Last reviewed on 26 September 2026.

© 2026 VNC - Virtual Network Consult AG. All rights reserved.